Design and preparation of Preliminary and Final Roadway and General Bridge Plans for constructing approximately 1.9 miles of a new rural four-lane divided roadway (16.4 meter median) in phased construction on the existing alignment, and approximately 4.4 miles of additional two-lane rural roadway paralleling the existing two-lane road, for a total of approximately 6.3 miles on Route US 165 between the Towns of Tullos and Olla in LaSalle Parish, LA. The design also included proposed temporary traffic movements,


intersections, turn lanes and drainage plans as part of the DOTD TIMED program.
The bridges are slab span bridges. One bridge is 72 meters in length (6-12 meter spans) with square pre-cast concrete piles and the other bridge is 96 meters (8-12 meter spans) with square pre-cast concrete piles. F&T completed the general bridge plans with DOTD completing the bridge details.
The asphalt section consisted of 150mm asphalt Asphalt (50 mm asphalt wearing 150mm asphalt binder), 250 Class II base course, and 300mm of compacted subgrade. The Class II base course could be stone or recycled PCC.
Drainage design consisted of cross drains, side drain pipes and a modified existing RC box culvert. The area from Tullos to Olla is rolling hills and drainage had to be looked at closely, which prompted Forte and Tablada to develop erosion control measures for during and after construction.

Sequence of construction and signing were developed as well as the designing and drawing of pavement marking layouts particularly in the transition of a 4 lane to 5 lane section of the north end of the project and at the cross over at the south end.
Construction cost was $13.2 MM.

 

   

Port Allen Loading Dock Facility
The scope of this project includes Engineering, Land Surveying and Construction Management

Infrastructure Improvements for Jackson Barracks
Jackson Barracks, New Orleans LA was completely inundated as a result of hurricane Katrina flooding.

US 165 Tullos - Olla
Design and preparation of Preliminary and Final Roadway and General Bridge Plans for constructing

Warsaw/Blood River Landing Sewer System Upgrade
Engineering, Land Surveying and Environmental Services for new sewer system to serve the Warsaw and

Bayou Plaquemine Bridge & Bayou Jacob Approach Roadway
Project included topographic surveying, engineering and Right-of-Way Plan development for the construction